docs: add Phase 3-4 SUMMARY files and update ROADMAP
Phase 3 (Lab 02 Network & VPC): - 03-01-SUMMARY.md: Test infrastructure (7 test scripts, 1637 lines) - 03-02-SUMMARY.md: Diátaxis documentation (11 files, 2500+ lines) - 03-03-SUMMARY.md: Infrastructure implementation (VPC networks) Phase 4 (Lab 03 Compute & EC2): - 04-01-SUMMARY.md: Test infrastructure (7 test scripts, 1389 lines) - 04-02-SUMMARY.md: Diátaxis documentation (11 files, 2500+ lines) - 04-03-SUMMARY.md: Infrastructure implementation (EC2 simulation) ROADMAP: Updated to reflect Phase 2-4 completion status Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -12,10 +12,10 @@
|
||||
| Phase | Plans Complete | Status | Completed |
|
||||
|-------|----------------|--------|-----------|
|
||||
| 1. Setup & Git Foundation | 2/2 | Complete | 2026-03-24 |
|
||||
| 2. Lab 01 - IAM & Sicurezza | 2/3 | In Progress| |
|
||||
| 3. Lab 02 - Network & VPC | 0/3 | Planning | - |
|
||||
| 4. Lab 03 - Compute & EC2 | 0/3 | Not started | - |
|
||||
| 5. Lab 04 - Storage & S3 | 0/3 | Not started | - |
|
||||
| 2. Lab 01 - IAM & Sicurezza | 3/3 | Complete | 2026-03-24 |
|
||||
| 3. Lab 02 - Network & VPC | 3/3 | Complete | 2026-03-25 |
|
||||
| 4. Lab 03 - Compute & EC2 | 3/3 | Complete | 2026-04-03 |
|
||||
| 5. Lab 04 - Storage & S3 | 1/3 | In Progress | - |
|
||||
| 6. Lab 05 - Database & RDS | 0/3 | Not started | - |
|
||||
| 7. Integration & Testing | 0/2 | Not started | - |
|
||||
| 8. Repository Structure | 0/2 | Not started | - |
|
||||
@@ -29,10 +29,10 @@
|
||||
### Phase Overview
|
||||
|
||||
- [x] **Phase 1: Setup & Git Foundation** - Repository setup, ambiente di sviluppo, requisiti sistema **COMPLETE**
|
||||
- [ ] **Phase 2: Lab 01 - IAM & Sicurezza** - Utenti Linux, permessi Docker, volume basics (2/3 complete)
|
||||
- [ ] **Phase 3: Lab 02 - Network & VPC** - Reti bridge isolate, simulazione VPC/Subnets (3/3 plans created)
|
||||
- [ ] **Phase 4: Lab 03 - Compute & EC2** - Container con limiti risorse, healthchecks
|
||||
- [ ] **Phase 5: Lab 04 - Storage & S3** - Docker Volumes, MinIO S3-compatible
|
||||
- [x] **Phase 2: Lab 01 - IAM & Sicurezza** - Utenti Linux, permessi Docker, volume basics **COMPLETE**
|
||||
- [x] **Phase 3: Lab 02 - Network & VPC** - Reti bridge isolate, simulazione VPC/Subnets **COMPLETE**
|
||||
- [x] **Phase 4: Lab 03 - Compute & EC2** - Container con limiti risorse, healthchecks **COMPLETE**
|
||||
- [ ] **Phase 5: Lab 04 - Storage & S3** - Docker Volumes, MinIO S3-compatible (1/3 complete)
|
||||
- [ ] **Phase 6: Lab 05 - Database & RDS** - PostgreSQL in rete privata, persistenza dati
|
||||
- [ ] **Phase 7: Integration & Testing** - Test cross-lab, validazione architettura completa
|
||||
- [ ] **Phase 8: Repository Structure** - Organizzazione file, cartelle, README
|
||||
@@ -83,8 +83,8 @@
|
||||
**Plans:** 3
|
||||
|
||||
- [x] [02-01-PLAN.md](.planning/phases/02-lab-01-iam-sicurezza/02-01-PLAN.md) — Create test infrastructure (Wave 0: test-01-user-creation.sh, test-02-docker-access.sh, 03-non-root-test.sh, 99-final-verification.sh, run-all-tests.sh) **COMPLETE** 2026-03-24
|
||||
- [ ] [02-02-PLAN.md](.planning/phases/02-lab-01-iam-sicurezza/02-02-PLAN.md) — Create Diátaxis documentation (Tutorial: 3 parts, How-to Guides: 3 guides, Reference: 3 documents, Explanation: IAM parallels)
|
||||
- [ ] [02-03-PLAN.md](.planning/phases/02-lab-01-iam-sicurezza/02-03-PLAN.md) — Create infrastructure (Dockerfile with non-root user, docker-compose.yml with user directive, infrastructure verification) **COMPLETE** 2026-03-24
|
||||
- [x] [02-02-PLAN.md](.planning/phases/02-lab-01-iam-sicurezza/02-02-PLAN.md) — Create Diátaxis documentation (Tutorial: 3 parts, How-to Guides: 3 guides, Reference: 3 documents, Explanation: IAM parallels) **COMPLETE** 2026-03-24
|
||||
- [x] [02-03-PLAN.md](.planning/phases/02-lab-01-iam-sicurezza/02-03-PLAN.md) — Create infrastructure (Dockerfile with non-root user, docker-compose.yml with user directive, infrastructure verification) **COMPLETE** 2026-03-24
|
||||
|
||||
---
|
||||
|
||||
@@ -105,9 +105,9 @@
|
||||
|
||||
**Plans:** 3
|
||||
|
||||
- [ ] [03-01-PLAN.md](.planning/phases/03-lab-02-network-vpc/03-01-PLAN.md) — Create test infrastructure (Wave 0: network creation tests, isolation tests, INF-02 compliance tests, final verification)
|
||||
- [ ] [03-02-PLAN.md](.planning/phases/03-lab-02-network-vpc/03-02-PLAN.md) — Create Diátaxis documentation (Tutorial: 3 parts, How-to: 4 guides, Reference: 3 docs, Explanation: VPC parallels)
|
||||
- [ ] [03-03-PLAN.md](.planning/phases/03-lab-02-network-vpc/03-03-PLAN.md) — Create infrastructure (docker-compose.yml with VPC networks, Dockerfile for API service, infrastructure verification)
|
||||
- [x] [03-01-PLAN.md](.planning/phases/03-lab-02-network-vpc/03-01-PLAN.md) — Create test infrastructure (Wave 0: network creation tests, isolation tests, INF-02 compliance tests, final verification) **COMPLETE** 2026-03-25
|
||||
- [x] [03-02-PLAN.md](.planning/phases/03-lab-02-network-vpc/03-02-PLAN.md) — Create Diátaxis documentation (Tutorial: 3 parts, How-to: 4 guides, Reference: 3 docs, Explanation: VPC parallels) **COMPLETE** 2026-03-25
|
||||
- [x] [03-03-PLAN.md](.planning/phases/03-lab-02-network-vpc/03-03-PLAN.md) — Create infrastructure (docker-compose.yml with VPC networks, Dockerfile for API service, infrastructure verification) **COMPLETE** 2026-03-25
|
||||
|
||||
---
|
||||
|
||||
@@ -128,9 +128,9 @@
|
||||
|
||||
**Plans:** 3
|
||||
|
||||
- [ ] [04-01-PLAN.md](.planning/phases/04-lab-03-compute-ec2/04-01-PLAN.md) — Create test infrastructure (Wave 0: resource limits tests, healthcheck tests, enforcement tests, final verification)
|
||||
- [ ] [04-02-PLAN.md](.planning/phases/04-lab-03-compute-ec2/04-02-PLAN.md) — Create Diátaxis documentation (Tutorial: 3 parts, How-to: 4 guides, Reference: 3 docs, Explanation: EC2 parallels)
|
||||
- [ ] [04-03-PLAN.md](.planning/phases/04-lab-03-compute-ec2/04-03-PLAN.md) — Create infrastructure (docker-compose.yml with resource limits, healthchecks, Dockerfile, infrastructure verification)
|
||||
- [x] [04-01-PLAN.md](.planning/phases/04-lab-03-compute-ec2/04-01-PLAN.md) — Create test infrastructure (Wave 0: resource limits tests, healthcheck tests, enforcement tests, final verification) **COMPLETE** 2026-04-03
|
||||
- [x] [04-02-PLAN.md](.planning/phases/04-lab-03-compute-ec2/04-02-PLAN.md) — Create Diátaxis documentation (Tutorial: 3 parts, How-to: 4 guides, Reference: 3 docs, Explanation: EC2 parallels) **COMPLETE** 2026-04-03
|
||||
- [x] [04-03-PLAN.md](.planning/phases/04-lab-03-compute-ec2/04-03-PLAN.md) — Create infrastructure (docker-compose.yml with resource limits, healthchecks, Dockerfile, infrastructure verification) **COMPLETE** 2026-04-03
|
||||
|
||||
---
|
||||
|
||||
|
||||