Files
Luca Sacchi Ricciardi b5386e8858 docs: add Phase 3-4 SUMMARY files and update ROADMAP
Phase 3 (Lab 02 Network & VPC):
- 03-01-SUMMARY.md: Test infrastructure (7 test scripts, 1637 lines)
- 03-02-SUMMARY.md: Diátaxis documentation (11 files, 2500+ lines)
- 03-03-SUMMARY.md: Infrastructure implementation (VPC networks)

Phase 4 (Lab 03 Compute & EC2):
- 04-01-SUMMARY.md: Test infrastructure (7 test scripts, 1389 lines)
- 04-02-SUMMARY.md: Diátaxis documentation (11 files, 2500+ lines)
- 04-03-SUMMARY.md: Infrastructure implementation (EC2 simulation)

ROADMAP: Updated to reflect Phase 2-4 completion status

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-03 17:36:15 +02:00

3.9 KiB

gsd_summary_version, phase, plan, type, wave, completed_date, duration_seconds
gsd_summary_version phase plan type wave completed_date duration_seconds
1.0 03-lab-02-network-vpc 01 execute 0 2026-03-25 2700

Phase 03 Plan 01: Test Infrastructure (TDD RED Phase) Summary

One-liner: Created comprehensive test suite following TDD methodology for Lab 02 Network & VPC, validating Docker bridge network creation, isolation between networks, and INF-02 compliance (no 0.0.0.0 port bindings).

Overview

Plan 03-01 established the test infrastructure foundation for Lab 02 (Network & VPC) following Test-Driven Infrastructure (TDI) principles. All tests were created in RED phase (failing initially since no implementation exists), enabling students to verify their work as they progress through network isolation and VPC simulation.

Artifacts Created

File Lines Purpose
labs/lab-02-network/tests/01-network-creation-test.sh 194 Validate Docker bridge network creation and configuration
labs/lab-02-network/tests/02-isolation-verification-test.sh 260 Verify network isolation between bridge networks
labs/lab-02-network/tests/03-inf02-compliance-test.sh 272 Ensure INF-02 compliance: private networks don't expose ports on 0.0.0.0
labs/lab-02-network/tests/04-verify-infrastructure.sh 244 Infrastructure verification script
labs/lab-02-network/tests/99-final-verification.sh 325 Student "double check" command for end-to-end validation
labs/lab-02-network/tests/run-all-tests.sh 146 Test suite orchestration with fail-fast behavior
labs/lab-02-network/tests/quick-test.sh 196 Quick validation for development

Total: 1,637 lines of bash test code

Technical Implementation

TDD Methodology Applied

  • RED Phase: Tests fail initially (expected - no infrastructure exists)
  • GREEN Phase: Ready for next plan (03-03) where implementation will make tests pass
  • REFACTOR Phase: Future optimization without breaking tests

Key Technical Decisions

  1. Network Testing Framework

    • Chose bash for portability and consistency with DevOps tasks
    • Used set -euo pipefail for strict error handling
    • Implemented helper functions for consistent test reporting
  2. Network Isolation Testing

    • Tests verify connectivity between containers in same network
    • Tests verify isolation between containers in different networks
    • Uses docker exec with ping, curl, and nc for validation
  3. INF-02 Compliance Verification

    • Scans docker-compose.yml for 0.0.0.0 port bindings
    • Verifies that private networks use --internal flag
    • Ensures no public exposure from private network containers
  4. Multi-Phase Testing

    • Phase 1: Network creation validation
    • Phase 2: Isolation verification between networks
    • Phase 3: Security compliance (INF-02)
    • Phase 4: Infrastructure verification
    • Final: End-to-end validation

Requirements Covered

  • TEST-01: Test scripts validate network creation and isolation
  • TEST-05: Test harness can be executed with single command (run-all-tests.sh)
  • INF-02: Private networks don't expose ports on 0.0.0.0
  • LAB-02: Docker bridge network simulation of VPC/Subnets

Deviations from Plan

Additional Artifact Created

04-verify-infrastructure.sh - Infrastructure verification script

  • Reason: Added to provide comprehensive infrastructure validation
  • Lines: 244
  • Purpose: Verifies docker-compose.yml configuration and network setup

Auto-Fixed Issues

None - all tests created successfully without deviations.

Next Phase Readiness

Test infrastructure is complete and ready for:

  • Plan 03-02: Diátaxis documentation creation
  • Plan 03-03: Infrastructure implementation (GREEN phase)

The test suite provides comprehensive validation for Docker bridge networks simulating VPC and Subnets, with clear parallels to cloud networking concepts.


Phase: 03-lab-02-network-vpc Plan: 01 Completed: 2026-03-25